Developer Permit Compliance
Full architectural shop drawings, MEP load schedules, and strata NOC approvals handled prior to quiet-hours site mobilization.
A new restaurant fit-out in Dubai turns an empty shell into a licensed operating kitchen and dining room. We prepare layout drawings for landlord, Dubai Civil Defense and Dubai Municipality food-control approval, then build kitchen ducting, grease traps, gas lines and interiors. Turnkey cost is AED 180–320 per sqft over 4–8 weeks, with a 2-year workmanship warranty. Many property owners pair these scopes with restaurant and cafe fit-outs alongside office renovation and commercial fit-outs when upgrading residences in JLT and Dubai Marina.
Includes on-site laser measurement, material specification review, an itemized written BOQ before work starts, and a 1-year written workmanship warranty.
Structured inspection, specification-grade materials, and work delivered to Dubai Municipality and DEWA compliance.
Transparent AED pricing guidance with itemized written quotations and written warranty.
| Task / Description | Estimated Cost | Time Required | Warranty |
|---|---|---|---|
| Approval Drawing Pack (layout, MEP, grease trap, gas schematic) | AED 6,500–18,000 | 1–2 weeks | Resubmission Support |
| Commercial Kitchen Exhaust Hood, Ducting & Make-Up Air | AED 18,000–55,000 | 1–2 weeks | 2 Years |
| Grease Trap Supply, Sizing & Drainage Tie-In | AED 4,500–9,500 | 2 days | 2 Years |
| Turnkey Shell-to-Opening Restaurant Fit-Out | AED 180–320 / sqft | 4–8 weeks | 2 Years |
From initial site measurement to itemized BOQ, developer approvals, and final handover.
We survey the unit, check ventilation shafts and gas availability, and plan kitchen flow around your menu and seating target.
We prepare and submit layout, MEP and gas drawings for landlord, Civil Defense and food-control review.
We build drainage, ducting, gas, power and wall and floor finishes in kitchen and service zones.
We finish joinery and lighting, commission equipment, and prepare the venue for official inspections.
Full architectural shop drawings, MEP load schedules, and strata NOC approvals handled prior to quiet-hours site mobilization.
Fire-rated partitions, sprinkler/smoke detector relocation, and emergency egress lighting coordinated to DCD/DHA rules.
Milestone quality inspections covering first-fix MEP pressure tests, wet-area flood tests, joinery tolerances, and final clean.
Transparent, fully managed renovation bundles with dedicated civil engineers, Dubai Municipality and developer NOC approvals, and written warranties.
New homeowners & tenants moving into Dubai villas or apartments
Coordinated redesign of your home wet areas with leak-free protection
Harmonized indoor-outdoor transformation for Dubai villa communities
Landlords and investors seeking high rental yields and zero vacancy
Full gut-renovation, spatial replanning, and luxury overhaul for villas & penthouses
Corporate offices, retail boutiques, clinics & commercial suites across Dubai
Common inquiries regarding new restaurant & café fit-out in Dubai.
Most restaurants need landlord or developer approval, Dubai Civil Defense fire and gas sign-off, and Dubai Municipality food-control approval of the kitchen layout before opening. We prepare the MEP drawings, grease trap sizing and exhaust calculations so the submission is complete the first time.
Café and restaurant fit-outs in Dubai typically cost AED 180–320 per sqft, with kitchens at the higher end because of stainless cladding, extraction and fire suppression. A 1,200 sqft café usually costs AED 215,000–380,000 including front-of-house, with a milestone payment schedule agreed upfront.
Not always. Many units use central LPG or electric cooking depending on the building. If gas is used, Civil Defense requires approved piping, leak detection and shut-off valves. We check the building service availability during the survey so your equipment list matches what the unit can support.
Construction typically takes 4–8 weeks for a 1,000–2,500 sqft venue once drawings are approved. Approvals before construction commonly add 2–4 weeks, so plan 6–12 weeks from survey to opening, including equipment commissioning and inspections. Related services: restaurant and café renovation and office renovation.
Dedicated coverage across 55 Dubai residential and commercial communities.
Share your project scope. A senior engineer inspects your property and issues a clear itemized BOQ proposal.
Customer Inquiries Only: We are not accepting SEO, website design, or web development proposals from freelancers or agencies and will not reply to such emails or submissions—all digital work is handled by our dedicated in-house team.
Explore complementary technical and property maintenance services in Dubai.
Explore related repair scopes, troubleshooting guides, and Dubai community coverage: