High-Rise FCU Chilled Water Piping Reconnection & Balancing in Downtown Dubai
Precision FCU chilled water piping reconnection, strainers flushing, and hydronic balancing for high-rise residential apartment in Downtown Dubai. Addressed inadequate delta-P and air trapped in cooling coil following building main chiller maintenance.
Technical Diagnostic & Field Execution Scope
Air trapped in fan coil unit chilled water loops following building central plant maintenance, causing persistent gurgling pipe noise, inadequate chilled water flow, and insufficient cooling across bedrooms.
High-point air venting and hydraulic line purging, inline Y-strainer disassembly and scale cleaning, replacement of closed-cell elastomeric Armaflex pipe insulation with vapor barrier tape, dynamic hydronic balancing to meet 1.8 m³/h design flow, and supply air temperature verification.
Class 0 Armaflex pipe insulation (19mm wall), reinforced aluminum vapor barrier tape, 1" Y-strainer stainless steel mesh filter, brass manual bleed air vent valves.
3 Hours
Carried out in full compliance with Dubai Municipality, Civil Defense, and developer NOC community regulations.
Tell us what needs attention.
Share a few details and our team will help identify the right service for your property.